Business Hilights

Tracking Nigeria's Headline Business News Online

Airport MMIA
Transport

Functional power coming to Lagos airport airfield after 13 years

Chevron
Advertisements
Ad 2
Advertisements
Ad 3
Advertisements

Strong indications have emerged suggesting that the waiting game over airfield lighting and night operations for Runway 18L at the busy Murtala Muhammed Airport in Lagos will soon be over.
Business Hilights gathered that a fresh move to end the blackout has commenced with the award of a fresh contract to install the critical facility in about six months. The Runway 18L that services the local airport was rehabilitated in 2008 but without provision for airfield lighting. The contract for the expansion and resurfacing of the local airport runway was awarded to P.W. Nigeria Limited at N3.56 billion. In the last 13 years, operators have described the local airport as an “operational nightmare”, especially during nightfall or bad weather. Scheduled carriers recently told The Guardian that though they had managed to cover up the sheer lapses for years, emerging demands in schedule reliability have made infrastructure-induced delays and losses unbearable. Managing Director of Federal Airports Authority of Nigeria (FAAN), Capt. Rabiu Yadudu, recently at the inspection of the Lagos Airport, said the 18L runway has been delayed because of an existing contract that has been an impediment for many years.

Business Hilights is an online news channel conceptualized and structured to report and track on a daily basis; latest developments in critical business sectors to serve as a one stop news gateway for governments, foreign and indigenous investors.